This is default featured slide 1 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 2 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

Friday, November 27, 2009

Container House: Digging the Foundation and Placing Rebar - Angela's Blog

This is obviously out of order as I thought I had made a post and it did not "take".


November 2009 - Hello, My amazing Build Shipping Container House blog readers. Nice to meet You again, today. Here, now. In this article titled, November 2009, you might find interesting information about what You looking for. Hopefully, the content from my 11/18/09 Three #5 rebars in the foundation trench. 11/20/09 Uprights tied to horizontals article will bring you many advantages both in work and in life. Enjoy Your readings. ^_^

Title : Container House: Digging the Foundation and Placing Rebar - Angela's Blog
URL Link : Container House: Digging the Foundation and Placing Rebar - Angela's Blog

Related Articles:


November 2009

This is obviously out of order as I thought I had made a post and it did not "take".



Monday, November 23, 2009

Container House: Pouring The Foundation - Angela's Blog


November 23. 2009 The rain has held us up. After Johnny and his crew dug the foundation, it poured rain. They had to dig it out again to install the rebar. Everytime they scheduled to come back, it rained. Today they finally poured the foundation. Concrete block should be delivered to the site tomorrow. The foundation seems massive for the house we are putting on it. Chris, the architect, explains that the curved roof would create uplift in a high wind and the foundation is to hold the house down, as well as up.
The upright rebars will come through the block and then concrete poured in the cavity. A bond beam will be poured on top of the wall with rebar in the bond beam. Steel connectors will be attached to the rebar in the bond beam and the containers welded to the connectors.
November 2009 - Hello, My amazing Build Shipping Container House blog readers. Nice to meet You again, today. Here, now. In this article titled, November 2009, you might find interesting information about what You looking for. Hopefully, the content from my Poured Foundation Grade Beam article will bring you many advantages both in work and in life. Enjoy Your readings. ^_^

Title : Container House: Pouring The Foundation - Angela's Blog
URL Link : Container House: Pouring The Foundation - Angela's Blog

Related Articles:


November 2009


November 23. 2009 The rain has held us up. After Johnny and his crew dug the foundation, it poured rain. They had to dig it out again to install the rebar. Everytime they scheduled to come back, it rained. Today they finally poured the foundation. Concrete block should be delivered to the site tomorrow. The foundation seems massive for the house we are putting on it. Chris, the architect, explains that the curved roof would create uplift in a high wind and the foundation is to hold the house down, as well as up.
The upright rebars will come through the block and then concrete poured in the cavity. A bond beam will be poured on top of the wall with rebar in the bond beam. Steel connectors will be attached to the rebar in the bond beam and the containers welded to the connectors.